MB Gold Limited (ASX | MBG), (“MB Gold” or the “Company”) is pleased to announce the initial results from the maiden reverse circulation (RC) drill program at the Marble Bar Gold Project in the Pilbara region of Western Australia.
Gold assay results from the first six (6) drill holes at the Twin Veins Prospect have been received and returned an exceptional intercept of 20m @ 1.74g/t Au from 81m, including 7m @ 4.06g/t Au from 81m in 26MBRC005.
The initial results are only from the first six holes, but further demonstrate the potential that exists at the Twin Veins Prospect and the Marble Bar Gold Project more broadly.
Drilling is ongoing and further results are expected in approximately three weeks’ time. MB Gold will announce the results as they are received, with interpretation ongoing and additional planned drill holes to be incorporated into a phase 2 drill program to begin in August.
The 6000m phase 2 RC drill program will include follow up drilling at Twin Veins and Douglas Find as well as initial drilling at the Razorback Prospect.
Logan Barber, CEO of MB Gold, commented: “The initial assay results are highly promising and include the widest significant intercept returned from Twin Veins to date.”