A 46% increase in head grade to 11.21g/t Au at Raleigh underground was behind a solid production quarter for Tribune from the EKJV. Attributable gold production of 25,590oz for the quarter at a very healthy $449/oz operating cost. In The Philippines, prep work continued ahead of diamond drilling at Diwalwal in October.
Key Points
-
During the quarter, 230,188 tonnes of EKJV ore were processed at the Kanowna Plant, 105,183 tonnes of EKJV ore and 0 tonnes of R&T ore were processed at the Greenfields Mill.
-
34,120 ounces of gold and 6,347 ounces of silver were credited to Rand and Tribune Bullion Accounts. (Tribune’s share is 75%)
-
At the end of the quarter, Tribune is entitled to a share of the following stockpiles: