Rand Mining Limited (ASX: RND) has provided its quarterly activities report for the period ending 30 June 2020.
HIGHLIGHTS
-
During the quarter, 41,308 tonnes of EKJV ore were processed at the Kanowna Plant and 47,623 tonnes of R&T ore were processed at the Lakewood Mill
-
8,858 ounces of gold and 1,192 ounces of silver were credited to Rand and Tribune Bullion Accounts.
-
Rand’s 25% share of bullion produced was 2,214.6 oz of gold and 298 oz of silver.
GEOLOGY AND MINING
EAST KUNDANA JOINT VENTURE
Raleigh Underground Mine Production
A large seismic event occurred at Raleigh on 14 January. Mining operations were suspended in April. The mine has been placed on care and maintenance.
A detailed study is assessing the economics of recommencing mining. Some stope production occurred in April from the 6031 level. Contained gold in stope ore mined during the quarter is tabulated in the announcement link below.