logo
powered-by-purple
Navigation
logo powered-by-purple
  • Insight
    • Diggers and dealers
    • Insights
  • Companies
    • Canyon Resources
    • Celsius Resources
    • Chilwa Minerals
    • Darktrace
    • Deep Yellow
    • Deterra Royalties
    • Global Lithium
    • Inside Diggers and Dealers
    • Insight
    • MB Gold
    • Mineral Resources
    • Northern Minerals
    • Northern Star
    • NRW Holdings
    • Paydirt
    • Sandfire
    • St George Mining
    • VRX Silica
    • Wind with Purpose
  • Industries
    • Bauxite
    • Broking Firm
    • Clean energy
    • Cobalt
    • Copper
    • Gold
    • Graphite
    • Insight
    • Iron ore
    • Lithium
    • Manganese
    • Mineral Sands
    • Mining Services
    • Nickel
    • Niobium
    • Oil & Gas
    • Property
    • Rare Earths
    • Royalties
    • Silica Sand
    • Silver
    • Technology
    • Uranium
    • Water services
    • Zinc
  • Video
  • About
  • Contact
  • Subscribe

Home / Silica Sand / Silica sand processing plant design and costs: VRX Silica

VRX Silica

  • ASX: VRX
    • Si

Silica sand processing plant design and costs: VRX Silica

  • 27 March

VRX Silica (ASX: VRX) has received an independent process design, engineering and cost estimate for a processing plant for its Arrowsmith and Muchea silica sands projects. It is expected to cost about $18 million per processing plant, while the total capex is estimated at $25 million per plant. A BFS for Arrowsmith and Muchea is expected in September.


VRX Silica (ASX: VRX) has received an independent process design, engineering and cost estimate for a processing plant for its Arrowsmith Silica Sand Projects, located 270km north of Perth, and its Muchea Silica Sand Project, located 50km north of Perth.

Highlights:

· Process circuit design and engineering completed

· Plant designed for optimum utilisation

· Processing plant cost estimated at $18m per plant

· Total capex (including plant feeder and water supply per plant) estimated at $25m per plant

· BFS for Arrowsmith and Muchea Projects expected in September 2019 Quarter

The independent processing testwork, process circuit design and engineering has been undertaken by CDE Global, a global leader in the construction of sand mining wet processing plants.

Plant Design and Costs

The plant design incorporates features to ensure high utilisation and performance with duplicated critical pumps and variable speed drives on all pumps. Three iterations of testwork have been carried out on the Arrowsmith and Muchea projects.

Significantly, the attritioning cycle has been demonstrated to be particularly effective in removing impurities from the quartz grains. Attritioning is an agitated high density slurry which allows for a high energy interaction of grains rubbing on grains which liberates attached fine particles and reduces particle size by breakage on corners and grain boundaries.

The process is repeated twice in VRX’s process circuit design. Testwork completed by VRX has confirmed that the plant design for the production of a high purity silica sand product suitable for the glass-making industry is the same for each of VRX’s three projects (Arrowsmith North and Arrowsmith Central and Muchea).

Peter Klinger

  • Contact

Share

  • LinkedIn
  • X
  • Facebook

Most Read

  • 15 September

DFS underscores global strategic value of Northern Minerals’ Browns Range heavy rare earths project

  • ASX: NTU
    • REE
    • Broking Firm
  • 25 October

Mineral Resources – MARBL JV to restart Wodgina Lithium Mine

  • ASX: MIN
    • Mining Services
  • 28 March

Wind with Purpose strikes deal with Barrington Energy & Gnaala Karla Booja

  • WWP
    • Clean energy

Related

  • 23 June

WA Govt confirms support for VRX Silica’s Muchea land swap proposal

  • ASX: VRX
    • Si
    • Broking Firm
  • 27 May

VRX Silica updates BFS for Arrowsmith North, announces equity raise

  • ASX: VRX
    • Si
    • Broking Firm
  • 11 December

VRX Silica signs two more binding offtakes for Arrowsmith North, appoints funding advisor

    • Si
  • 25 November

VRX Silica raises $2.1m to progress Arrowsmith North pre-development works

  • ASX: VRX
    • Si
    • Broking Firm

NEWSLETTER

Get news, as it happens

Sign up to receive our weekly roundup, and releases of interest, as they happen.

  • This field is for validation purposes and should be left unchanged.
logo

Investor Insight, powered by Purple, delivers the stories that matter to the people who matter – across your preferred communications platform.

From breaking news to analysis, opportunities and thought leadership, Investor Insight is your window into some of Australia’s most exciting listed and non-listed companies.

  • Insight
    • Diggers and dealers
    • Insights
  • Companies
    • Canyon Resources
    • Celsius Resources
    • Chilwa Minerals
    • Darktrace
    • Deep Yellow
    • Deterra Royalties
    • Global Lithium
    • Inside Diggers and Dealers
    • Insight
    • MB Gold
    • Mineral Resources
    • Northern Minerals
    • Northern Star
    • NRW Holdings
    • Paydirt
    • Sandfire
    • St George Mining
    • VRX Silica
    • Wind with Purpose
  • Industries
    • Bauxite
    • Broking Firm
    • Clean energy
    • Cobalt
    • Copper
    • Gold
    • Graphite
    • Insight
    • Iron ore
    • Lithium
    • Manganese
    • Mineral Sands
    • Mining Services
    • Nickel
    • Niobium
    • Oil & Gas
    • Property
    • Rare Earths
    • Royalties
    • Silica Sand
    • Silver
    • Technology
    • Uranium
    • Water services
    • Zinc
  • Video
powered-by-purple
  • About
  • Contact
  • Subscribe
  • Purple
  • Privacy Policy
  • Disclaimer

Copyright 2026 Purple